Skip to main content

We are tracking three IDIQ’s expected to drop in the first half of 2020: DSS Agency Strategic Business Management Support Services Program Support Service, Engineering and Support Services for Network and Information Systems Technology Programs, and Energy Information Administration OMNIBUS Procurement 5 (EOP V). Learn more about these opportunities in the descriptions below.

[fusion_imageframe image_id=”6311|full” max_width=”” style_type=”” blur=”” stylecolor=”” hover_type=”none” bordersize=”” bordercolor=”” borderradius=”” align=”none” lightbox=”no” gallery_id=”” lightbox_image=”” lightbox_image_id=”” alt=”” link=”” linktarget=”_self” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” filter_hue=”0″ filter_saturation=”100″ filter_brightness=”100″ filter_contrast=”100″ filter_invert=”0″ filter_sepia=”0″ filter_opacity=”100″ filter_blur=”0″ filter_hue_hover=”0″ filter_saturation_hover=”100″ filter_brightness_hover=”100″ filter_contrast_hover=”100″ filter_invert_hover=”0″ filter_sepia_hover=”0″ filter_opacity_hover=”100″ filter_blur_hover=”0″]https://redteamllc.cloudorpheus.com/wp-content/uploads/2017/12/DODc-12.gif[/fusion_imageframe]
DSS Agency Strategic Business Management Support Services Program Support Service

Program Snapshot:

Agency: DoD
Release Date: April 2020 (Deltek Estimate)
Value: $300 Million
Competition Type: SB Set-Aside

Program Summary: The Department of Defense (DoD), Defense Security Service (DSS), has a requirement for Agency Strategic Business Management Support Services; Program Support Service.

Requirements:

The Contractor shall perform the following areas:

  • Provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision and other items as well as non-personal services necessary to perform PMS.
  • Provide support for program and project management, business management, process management, process improvement, and performance management capabilities.
MORE DETAILS HERE
[fusion_imageframe image_id=”6063|large” max_width=”” style_type=”” blur=”” stylecolor=”” hover_type=”none” bordersize=”” bordercolor=”” borderradius=”” align=”none” lightbox=”no” gallery_id=”” lightbox_image=”” lightbox_image_id=”” alt=”” link=”” linktarget=”_self” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” filter_hue=”0″ filter_saturation=”100″ filter_brightness=”100″ filter_contrast=”100″ filter_invert=”0″ filter_sepia=”0″ filter_opacity=”100″ filter_blur=”0″ filter_hue_hover=”0″ filter_saturation_hover=”100″ filter_brightness_hover=”100″ filter_contrast_hover=”100″ filter_invert_hover=”0″ filter_sepia_hover=”0″ filter_opacity_hover=”100″ filter_blur_hover=”0″]https://redteamllc.cloudorpheus.com/wp-content/uploads/2018/04/Navy-1024×1024.jpg[/fusion_imageframe]
Engineering and Support Services for Network and Information Systems Technology Programs

Program Snapshot:

Agency: Navy
Expected Release Date: May 2020 (Deltek Estimate)
Value: $250 Million
Competition Type: Full and Open | Unrestricted

Program Summary: The Department of the Navy, Space and Naval Warfare Systems Center, San Diego, has a continuing requirement for Engineering and Technical Support Services for SSC in San Diego.

Requirements:

This effort will include support in the following general areas:

  • Development
  • Systems engineering
  • Test and evaluation
  • Program management
  • Fleet engineering
  • Integrated logistics
  • Training support for the following capability areas:
    • Submarine Command, Control, and Communications (C3)
    • Undersea Communications
    • Net-centric Communications
    • eXtensible Enterprise Services
    • Defense Information Technology Services and Engineering Support
    • Global Strike and Joint Strategic Communications

Technical requirements include:

  • Standards Work Plan
  • White Papers outlining Needs of NS/EP NGN-PS Contributions to 3GPP and ATIS
  • Standards Meetings Participation, Contributions, Editorships, and Meeting Reports
  • NS/EP NGN-PS Requirements Support
  • NS/EP NGN-PS Modeling and Analysis Support
  • NS/EP NGN-PS Prototyping and Service Testing
MORE DETAILS HERE
[fusion_imageframe image_id=”12190|full” max_width=”” style_type=”” blur=”” stylecolor=”” hover_type=”none” bordersize=”” bordercolor=”” borderradius=”” align=”none” lightbox=”no” gallery_id=”” lightbox_image=”” lightbox_image_id=”” alt=”” link=”” linktarget=”_self” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” class=”” id=”” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=”” filter_hue=”0″ filter_saturation=”100″ filter_brightness=”100″ filter_contrast=”100″ filter_invert=”0″ filter_sepia=”0″ filter_opacity=”100″ filter_blur=”0″ filter_hue_hover=”0″ filter_saturation_hover=”100″ filter_brightness_hover=”100″ filter_contrast_hover=”100″ filter_invert_hover=”0″ filter_sepia_hover=”0″ filter_opacity_hover=”100″ filter_blur_hover=”0″]https://redteamllc.cloudorpheus.com/wp-content/uploads/2019/11/Department-of-Energy.png[/fusion_imageframe]
Energy Information Administration OMNIBUS Procurement 5 (EOP V)

Program Snapshot:

Agency: DOE
Expected Release Date: June 2020 (Deltek Estimate)
Value: $285 Million
Competition Type: SB Set-Aside | Full and Open | Unrestricted

Program Summary: The Department of Energy (DOE), Energy Information Administration (EIA) may have an ongoing requirement for support services for six different service areas.

Requirements:

The Contractor shall provide support services in the following service areas:

  • Program Management
  • Survey Operations
  • Energy Analysis and Modeling
  • Information Technology Support
  • Product/Service Development Production and Marketing
  • Organizational Support

General support activities to be implemented on an as-needed basis in order to achieve efficient operation of this contract include a range of the following activities:

  • Continuity of Operations (COOP) support, planning, and implementation
  • Consolidated project management for all tasks
  • Business process re-engineering
  • EIA business procedure, policy, and methodology studies and analysis
  • Independent verification and validation of EIA software application acquired and installed by others outside this contract
  • EIA software applications disaster contingency planning support
  • EIA Document and Systems Governance and Configuration management
  • Development of warranty and maintenance support agreements
  • Research and development of service level agreements and tools
  • General project coordination, administrative, and communications support specifically including managing and acquiring necessary publications, periodicals, and data sources
  • Electronic Commerce (EC)/Electronic Data Interchange (EDI)
MORE DETAILS HERE

Leave a Reply